Home GAMES / OEE Calculator

OEE Calculator6.0.1

Rating

Genre

GAMES

Size

18.5 MB

Version

6.0.1

Update

Sep 13 2024

Download OEE Calculator 6.0.1 APK for Android. Download now!

Download

Overall Equipment Efficiency (OEE) is one of the best methods using measuring performance of production facilities. Having a mobile app to calculate OEE will make our work easy.


Share OEE is using messaging, email, Viber, etc

Use the share button on top to share your OEE. It will allow you to share OEE data (which is available on the screen) using any method your phone supports. (Email, sms, Viber, etc)


How to Use OEE Calculator


Please note that all 'time' values should be in the minutes.


Please note that total output, output per hour, reject and rework should use the same measurement. (Don’t use total output in kg and rejects in liters. Both should be in kg or liter)


Date

Select the date which data belongs


Machine

Enter the name of the Machine/Line to which data belongs.


Planned Working Time

This is the time which machine/line operates, including planned breakdown and meeting times. You can consider mealtime and teatime as your interest. If your Planned Working Time includes mealtimes and teatime, please add them to the Planned Down Time.


Planned Down Time

Enter any time that is included in Planned Working Time but need to exclude the time calculating OEE. Preventive Maintenance, Lunch, and teatime (if included in Planned Working Time) are examples.


Meeting Time

If you have any meeting enter the time taken for that here. (This time also not considering when calculating OEE)


Down Time

Enter any Down time occurred during working time.


Availability

Availability factor calculates using below formula


Availability % = (Planned Working Time – Planned Down Time – Meeting Time – Down Time) *100 / (Planned Working Time – Planned Down Time – Meeting Time)


Total Output

Enter the total output during the period. This should include Rejected Items & Reworked Items.


Output Rate

Enter the standard value here. Enter output per minute here.


Performance

Performance factor calculates using below formula


Performance % = (Total Output / Output per Hour) * 100 / (Planned Working Time – Planned Down Time – Meeting Time – Down Time)


Reject

Enter reject quantity during the period.


Rework

Enter rework quantity during the period.


Quality

Quality factor calculates using below formula


Quality % = (Total Output – Reject – Rework) *100 / Total Output


When you enter data, the app calculates the Availability, Performance and Quality when it has data to calculate those. If you enter any non-numeric value, you will receive an error message. After you enter all data, you can share it with others using the share button. You can clear the data using the “Clear” button.

3 / 5 ( 617 votes )

Recommended for you

Trip Logbook
Trip Logbook

6.29

13.6 MB

OneLoad
OneLoad

9.10.0

24.5 MB

Unboxed
Unboxed

1

153.3 MB

Monotony
Monotony

1.7.006

33.7 MB

Cute Graffiti Theme
Cute Graffiti Theme

1.0.11

8.6 MB

Seven Sky
Seven Sky

2.6.5

76.1 MB

GOH
GOH

2.9.43

23.8 MB